HM

Hotel *** & Restaurant in Mengíbar

The proposal is set in one of the industrial areas of Mengíbar (Spain). Its position is determined by the proximity to the main roads that connect the province with Madrid, Granada, Cordoba and Seville and in turn the proximity to the town center, which makes its location is strategic.

The local Mandatory Regulations define a very specific rules:

We have a forced separation from boundaries of four meters, maximum height 9,60 meters and a floor area of no more than 1.000 m2.

These mandatories set up the solution adopted and define absolutely the final design.

Project year 2008

Construction year 2008-2009

Situation Plaza Bibarrambla esquina Calle Zacatín, Granada

Site management DTR_studio arquitectos / Juan Antonio Rodríguez

Project manager Jose Ángel Castro

Builder Mario Palma

Developer Desarrollos y Estructuras Phassa S.L.

Budget 600.000 €

Proyect concepts

Strategic ubication

The Hotel, as a unique and reference must be shown and positioned in a prominent place. This, the placement of the same area of the parcel abutting the highway Bailen brings us rolled flows both from the industrial zone as the highway exits.

This position leads us to create a powerful front towards the road and releases all existing garden area and relaxation area and expansion of the hotel. In addition we make an enclosure that appropriates new existing ships giving them a new character that will be enhanced with subsequent conversion into halls for weddings.

Spatial and volumetric changes

The aforementioned problem begs the importance of ensuring volumetry as a clearly dominant position in a hostile environment like the one we found.

The determination of planning a limitation both surface height and shows us the impossibility of working with the built, but if we have the opportunity to work with empty space and transparencies, arguments that give us the possibility to carry out spatial and volumetric changes that begin to be more in line with what the project demands.

Strategic volumetry

Thus the resulting volumetric simulates a total occupancy of the building in different plants, but there is a flush of the same inside and outside resulting adequacy thereof to the building regulations in the area without losing the roundness sought.

Additionally, the building is deconstructed right in the entrance area to make that transition and position near the corner where the two streets.

HM

Hotel *** & Restaurant in Mengíbar

The proposal is set in one of the industrial areas of Mengíbar (Spain). Its position is determined by the proximity to the main roads that connect the province with Madrid, Granada, Cordoba and Seville and in turn the proximity to the town center, which makes its location is strategic.

The local Mandatory Regulations define a very specific rules:

We have a forced separation from boundaries of four meters, maximum height 9,60 meters and a floor area of no more than 1.000 m2.

These mandatories set up the solution adopted and define absolutely the final design.

Project year 2008

Construction year 2008-2009

Situation Plaza Bibarrambla esquina Calle Zacatín, Granada

Site management DTR_studio arquitectos / Juan Antonio Rodríguez

Project manager Jose Ángel Castro

Builder Mario Palma

Developer Desarrollos y Estructuras Phassa S.L.

Budget 600.000 €

Proyect concepts

Strategic ubication

The Hotel, as a unique and reference must be shown and positioned in a prominent place. This, the placement of the same area of the parcel abutting the highway Bailen brings us rolled flows both from the industrial zone as the highway exits.

This position leads us to create a powerful front towards the road and releases all existing garden area and relaxation area and expansion of the hotel. In addition we make an enclosure that appropriates new existing ships giving them a new character that will be enhanced with subsequent conversion into halls for weddings.

Spatial and volumetric changes

The aforementioned problem begs the importance of ensuring volumetry as a clearly dominant position in a hostile environment like the one we found.

The determination of planning a limitation both surface height and shows us the impossibility of working with the built, but if we have the opportunity to work with empty space and transparencies, arguments that give us the possibility to carry out spatial and volumetric changes that begin to be more in line with what the project demands.

Strategic volumetry

Thus the resulting volumetric simulates a total occupancy of the building in different plants, but there is a flush of the same inside and outside resulting adequacy thereof to the building regulations in the area without losing the roundness sought.

Additionally, the building is deconstructed right in the entrance area to make that transition and position near the corner where the two streets.


Granada Headquarters

Calle Violetas 18. 18008 Granada
dtr@dtr-studio.es | 958222957

Headquarters Costa del Sol

Plaza del Santo Niño. 29480 Gaucín
dtr@dtr-studio.es | 952151364

Social Networking

Instagram
Linkedin

© DTR_studio. All rights reserved.

Legal | Privacy Policy | Cookies Policy